Projects
EQUINIX
Madrid 2
-
Climate installation: 24 perimeter lime units (crah) and 3 chillers
-
Fire protection: water mist, conventional extinguishing, fire hydrants, early detection (Vesda) and conventional detection
-
Fuel transfer system: control system, tanks and pipes
-
Commissioning: non-destructive testing, pipe cleaning (flushing), hydraulic balancing